Abstract
This research aims to study the Atbara bridge, and through this study, we find that
the lower parts of the bridge, the pivot chairs and the bases have a dump due to
the accumulation of dirt and dust, so the cleaning process must be done first and
then paint, and we find that the path of the road is in the direction of the Damer.
Atbara there are transverse cracks caused by poor cohesion of the paving
materials in the joints areas. They are treated by cleaning the cracks and injecting
them with epoxy, and we find ٲ that it does not contain pits What is in the Atbara
Damer track, we find that there are transverse cracks caused by increased loads
and ٳ the use of bad joints that are treated by drilling The cracks are filled and the
injection process is carried out, and we find that there are deep pits caused by
insufficient pavement thickness, and the use of a poor-quality mixture that is
treated by scraping the sides of the excavation and maintaining the flanges and
sheets of iron, then the patchwork process is carried out. The main road is in the
direction of the dumb Atbara and the inclined parts of the gable need
maintenance, and the rail track is good and does not need maintenance. We find
that the protection sides at the entrance to the bridge from towards the Damer
Atbara need to be strengthened and maintained, and they are not replaced with
new parts and reinforced with welding of the damaged parts, and we find the
cause of the lighting problem. Using poor lamps So, high quality lamps must be
used and placed at close distances until we get adequate lighting. A periodic
examination and examination must be carried out on the old one so that the
defects are treated so as not to affect the life of the old of the bridge.