حساب البرنامج الزمني لمشروع هندسي باستخدام برنامج البرايموفيرا
| dc.contributor.author | حسن عمر ابكر عمر | |
| dc.contributor.author | محي الدين الهادي دمحم ابراهيم | |
| dc.date.accessioned | 2026-10-07T05:55:03Z | |
| dc.date.issued | 2024-03 | |
| dc.description.abstract | The research aims to define the time program and it’s important for any engineering projects, as well as to study project management process in general, and the time management process for engineering projects in particular using the primavera program ,as well as identify several methods such as the Gantt chart and the critical path . Area of 280 square meters, and applying the primavera program was applied a residential building with the program, if was found that the total time to implement the projects was 370 days. According to the schedule of materials, quantities, workmanship, and labor available for project. | |
| dc.identifier.uri | https://dspace.eaeu.edu.sd/handle/123456789/1263 | |
| dc.publisher | جامعة الشيخ عبدالله البدري | |
| dc.title | حساب البرنامج الزمني لمشروع هندسي باستخدام برنامج البرايموفيرا | |
| dc.type | Thesis |