حساب البرنامج الزمني لمشروع هندسي باستخدام برنامج البرايموفيرا

dc.contributor.authorحسن عمر ابكر عمر
dc.contributor.authorمحي الدين الهادي دمحم ابراهيم
dc.date.accessioned2026-10-07T05:55:03Z
dc.date.issued2024-03
dc.description.abstractThe research aims to define the time program and it’s important for any engineering projects, as well as to study project management process in general, and the time management process for engineering projects in particular using the primavera program ,as well as identify several methods such as the Gantt chart and the critical path . Area of 280 square meters, and applying the primavera program was applied a residential building with the program, if was found that the total time to implement the projects was 370 days. According to the schedule of materials, quantities, workmanship, and labor available for project.
dc.identifier.urihttps://dspace.eaeu.edu.sd/handle/123456789/1263
dc.publisherجامعة الشيخ عبدالله البدري
dc.titleحساب البرنامج الزمني لمشروع هندسي باستخدام برنامج البرايموفيرا
dc.typeThesis

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
2.pdf
Size:
5.06 MB
Format:
Adobe Portable Document Format

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.63 KB
Format:
Item-specific license agreed to upon submission
Description: